Opening of the Bow Thruster Grid and Removal of Two Entangled Mooring Lines Around the Blades
Opening of the bow thruster grid and removal of two mooring lines entangled around the blades at Safi port on December 16, 2024.
Explore the project→Swell Marine interventions, their context and the work carried out, presented as they are published.
18 ProjectsPage 1 / 2
01
Opening of the bow thruster grid and removal of two mooring lines entangled around the blades at Safi port on December 16, 2024.
Explore the project→02
Underwater hull inspection with a live video feed, discussion with the shipowner and a report containing maintenance recommendations.
Explore the project→03
Underwater intervention on obstructed seawater intakes, cleaning pipelines and removing foreign objects to restore a vessel's air conditioning.
Explore the project→04
Underwater video inspection of MV DUCHESS EMERALD at Atlantic Safi Port on November 2, 2024, with an overview of submerged components to inspect.
Explore the project→05
Cleaning of water areas by SWELL MARINE SERVICES' commercial divers at the port of Jorf Lasfar, commissioned by project owner Marsa Maroc.
Explore the project→06
Refloating, transport by sea and installation of an 8-tonne quay fender at the mooring dolphin for the ferry berth.
Explore the project→07
Underwater inspection of an outfall in 2023, at a depth of 33.8m, using a Go pro 8 camera.
Explore the project→08
Underwater inspection of a quay wall in 2023, using a Go pro 8 camera.
Explore the project→09
Underwater video inspection of a cargo vessel's hull at the port of Casablanca in September 2023, using a Go pro 8 camera.
Explore the project→10
Dredging of high spots in 2022. Equipment listed: KMB28, Go Pro+, a 4.60m zodiac boat, a 140bar hydraulic power unit and a Stanley TP03 pump.