Cutting and removal of mooring lines from the bow thruster.
Cutting and removal of mooring lines from the bow thruster at the port of Casablanca in 2023. A one-day intervention during a cargo operation.
Workplace: Port of Casablanca Duration of the mission : 1 day Working conditions: During a cargo operation. Equipment used: Stanley Tools GR2930101 Underwater hydraulic grinder Year of the mission : 2023