Projects

Underwater surveys and works

Live underwater video inspection (CCTV) at the port of Jorf Lasfar in 2023.

Underwater surveys and works

Live underwater video inspection (CCTV)

Port of Jorf Lasfar

Year: 2023

An error during berthing or departure manoeuvres is undoubtedly the most frequent case. However, it may also involve an error in tidal calculations (B), or excessive vessel speed (C). In these circumstances, the port authority cannot be held responsible for the navigator's errors, provided that it has put in place an adequate system to warn them of hazards. This means a properly charted port area, provision or maintenance of a channel allowing the vessel to reach the port safely, hazard marking, tidal information, and so on.

Below the surface, at the heart of your operations.

Planning a marine operation?

Our team assesses your needs and supports your underwater and port operations.

Request a quote